Spider provides suspended scaffolding, fall protection

Words: Heidi AndersSpider, a division of SafeWorks, LLC, provides a complete suspended access solution to general contractor Reconstruction Experts Inc. for inspection and repair work on the Penterra Plaza in Denver, CO.

This 280-ft tall, multi-terraced commercial and residential building required inspection of every weep hole and brick tuck pointing location of the exterior façade, leak and pressure tests on every window fitting, and corrective glazing work on failed windows.

Over 750 linear feet of SpiderRailTM, Spider’s new temporary guardrail system, was used to provide OSHA-compliant fall protection along the edges of the building. Seven modular platforms ranging in length from 20-35 ft and powered by Zmac® hoists, twenty davits, and custom engineered davit adapters provided access for the contractors to complete their inspection and repair work to the windows & façade. Finally, a 170T hydraulic crane was used to load the equipment onto the building.

Spider was involved in all of the safety planning for this project and provided Competent Person Training for all of the mason workers, glaziers and general contractors utilizing the equipment.

“As a first time customer of Spider, I have nothing but positive things to say about the equipment and service they are providing for the Penterra Plaza project,” states Jake Marshall, Project Manager with Reconstruction Experts Inc. “Whenever we are faced with challenges, Spider’s Denver team personally takes action and delivers a safe and timely solution. We are especially impressed with their plan to utilize a crane service to load the equipment onto the structure, since transporting it through the building would have been disruptive to the building’s occupants. Not only did this improve our efficiency, it reassured the building owners that their concerns were our top priority.”

Spider was the only local swing stage company that could provide the high volume of rental equipment, custom fabrication and engineering, and extensive training required for Penterra Plaza. After more than 100 days into the project, there have been no incidents or injuries.
Why Belden Brick Has Lasted 140 Years
August 2025

‘Why We’ve Lasted 140 Years’ How The Belden Brick Company’s approach to manufacturing excellence continues to solve modern brick masonry challenges Ask masonry contractor Jason Hauer what separates good brick from great brick, and he’ll tell you about h

Achieving Consistent Mortar Mixes: Key to Successful Masonry Projects
August 2025

Consistency is the cornerstone of quality masonry. A uniform mortar mix is critical for the structural integrity and durability of any project, from a simple brick wall to an intricate stone design. When mortar lacks consistency, it can lead to weak joint

What’s In Your Data Backup Strategy?
August 2025

Your business handles plenty of critical data, and losing it could result in operational downtime, financial losses, and a damaged reputation. For businesses owners, a robust data backup strategy can help you stay resilient and competitive in the fuel mar

Facial Recognition for Masonry Companies
August 2025

Masonry companies face a unique set of challenges. Managing a mobile workforce across multiple job sites requires precision and accountability. CrewTracks recognizes this need and has introduced an innovative facial recognition feature designed to streaml