Spider provides suspended scaffolding, fall protection

Words: Heidi AndersSpider, a division of SafeWorks, LLC, provides a complete suspended access solution to general contractor Reconstruction Experts Inc. for inspection and repair work on the Penterra Plaza in Denver, CO.

This 280-ft tall, multi-terraced commercial and residential building required inspection of every weep hole and brick tuck pointing location of the exterior façade, leak and pressure tests on every window fitting, and corrective glazing work on failed windows.

Over 750 linear feet of SpiderRailTM, Spider’s new temporary guardrail system, was used to provide OSHA-compliant fall protection along the edges of the building. Seven modular platforms ranging in length from 20-35 ft and powered by Zmac® hoists, twenty davits, and custom engineered davit adapters provided access for the contractors to complete their inspection and repair work to the windows & façade. Finally, a 170T hydraulic crane was used to load the equipment onto the building.

Spider was involved in all of the safety planning for this project and provided Competent Person Training for all of the mason workers, glaziers and general contractors utilizing the equipment.

“As a first time customer of Spider, I have nothing but positive things to say about the equipment and service they are providing for the Penterra Plaza project,” states Jake Marshall, Project Manager with Reconstruction Experts Inc. “Whenever we are faced with challenges, Spider’s Denver team personally takes action and delivers a safe and timely solution. We are especially impressed with their plan to utilize a crane service to load the equipment onto the structure, since transporting it through the building would have been disruptive to the building’s occupants. Not only did this improve our efficiency, it reassured the building owners that their concerns were our top priority.”

Spider was the only local swing stage company that could provide the high volume of rental equipment, custom fabrication and engineering, and extensive training required for Penterra Plaza. After more than 100 days into the project, there have been no incidents or injuries.
The STABILA Force Driven by Operations
July 2025

Leadership In today's competitive business landscape, maintaining an efficient, well-organized warehouse is essential for meeting customer demands and ensuring smooth operations. By implementing effective processes and best practices, businesses can achi

MASONRY STRONG Podcast, Episode 24 Recap: Gary Hensley, VP of Sales at Oldcastle Adams
July 2025

On this episode of the MASONRY STRONG Podcast, Gary Hensley joins Justin in Indianapolis to talk about his story within the masonry industry, how he got started, how he's seen it evolve, and where he sees it going. Why the Masonry Industry? Concrete and

The Enduring Power of Structural Masonry
July 2025

Masonry has been holding its ground for millennia — literally. And thanks to the simple brilliance of arching action, it continues to do so with strength, style, and surprising efficiency. In an era of advanced modeling and fast-moving schedules, one time

Business Building: Do Project Manager / Estimator Combos Work?
July 2025

Steve owns SJP Contractors, a mid-size general contractor specializing in commercial projects. Over the last several years, his company has grown to over $16 million in annual sales, with an average project size of $500,000 to $1,500,000, employing 45 off