Spider provides expert suspended scaffolding solution for Colorado State Bank Building

Words: Heidi AndersSpider, a division of SafeWorks, LLC, provides the suspended access solution, including swing stages, fall protection and training, for installation of panels on the façade of the 400-ft tall Colorado State Bank Building in downtown Denver, CO.

Under the direction of general contractor Swinerton Builders, Spider supplied subcontractor GEN3 with nine u-shaped swing stages powered by Zmac/1000® traction hoists to access the columns of the structure. In addition, seven standard modular platforms ranging in length from 15 ft to 45 ft and also powered by the workhorse Zmac/1000®s are increasing efficiency by feeding materials to the u- shaped stages. Safety line, rope grabs and termination plates from Spider’s trusted line of fall protection solutions are also in place throughout the project.

Spider provided Competent Person Training for all of the equipment operators from GEN3 and Swinerton Builders and is making regular site visits to ensure safety compliance.

“Spider’s cooperation and knowledge is second to none, and as the superintendent for the 27-story re- clad of the Colorado State Bank building, that makes them first in line when it’s time for staging and safety,” says Doug Schnorr, Senior Superintendent for Swinerton Builders.

Spider was the only local swing stage company that could provide the high volume of rental equipment for the project’s 7-month duration along with the training support and expertise. Since the work began in April, there have been no incidents or injuries, and the goal is for that trend to continue until the project’s October completion.
Strength, Style, and Staying Power: The Impact of Stone Veneer in Commercial Design
October 2025

Stone has always signified strength, permanence, and sophistication. In commercial environments, those qualities go beyond design and directly shape how a business is perceived. A lobby, storefront, or even a single feature wall can become the first chapt

Bonding with Masonry: 2025 Q3
October 2025

This issue’s questions come from an Engineer and an Architect. What questions do you have? Send them to info@masonrymagazine.com, attention Technical Talk. Q. An Engineer asked when the reinforcement for the masonry diaphragm chords must be continuous th

Spherical Block LLC Continues Silver MAP Partnership in 2026
October 2025

The Mason Contractors Association of America (MCAA) is happy to announce that Spherical Block LLC has renewed its Silver Partnership for the 2026 Masonry Alliance Program.

EZG Manufacturing Renews its Cornerstone Partnership in 2026
October 2025

The Mason Contractors Association of America (MCAA) is delighted to announce that EZG Manufacturing will continue its esteemed Cornerstone partnership in the 2026 Masonry Alliance Program.