Masonry Magazine April 2000 Page. 14

Masonry Magazine April 2000 Page. 14

Masonry Magazine April 2000 Page. 14
FASTER & EASIER to set up, work on, take down & move

MORGEN'S NEW CABLE-LESS TOWER SCAFFOLDING

We'll put money in your pocket with these design breakthroughs:

• No more cables to jump.

• One-third fewer towers required with a 17-foot long bridge between pairs.

• Less towers to purchase & move covers 67% more wall than scaffolds on 7-foot centers.

• Large, open 17-foot long, braceless working area for faster material stocking.

• Optional power raising of a fully-loaded platform with a 3/4" drill.

• Level platform using standard 8' & 16' planks.

MORGEN THE AUTHORITY IN ADJUSTABLE SCAFFOLDING

800-952-4726
605-665-9654
605-665-7017 Fax
MORGEN MANUFACTURING CO.
P.O. Box 160 Yankton, SD 57078-0160 U.S.A