Painter's Corner: Expansion Joints

Words: Todd Fredrick

Expansion Joints

Jerry Painter  

Question: We recently acquired a project that has brick veneer over CMU. The plans do not show any expansion joints and the specifications do not mention anything about locations. The GC told us to put them where we thought they should be located. What should I do? First, check your bid form scope of work and contract to make sure someone did not slip into your paperwork. This is design criteria and not your responsibility. I do not have a “Gibbs List of Rules”, but if I did, this rule would be close to the top, if not #1! PUT IT IN WRITING! This is a classic opportunity to send to the GC a Request for Information (RFI). I have even had CM’s and GC’s complain that if I put it in writing, then they will “Have to” respond. Well, “Duh”, isn’t that the point? Expansion joints in a brick veneer are part of a group of joints called “Movement Joints.” These are void of mortar and allow for differential movement in masonry. This movement can be caused by load, stress, shrinkage, deflection, or expansion. We are only dealing with brick veneer expansion joints. So let’s find out about TMS 402-13, aka the “Code”. In Chapter 12 – Veneer, paragraph 12.1.1 states, and I quote, “This chapter provides for requirement for design and detailing of anchored masonry veneer and adhered masonry veneer”. Keeping that idea moving forward, let’s look at paragraph 12.1.6.3, which states, “Design and detail the veneer to accommodate differential movement.” The Code has laid the type, size, and location of expansion joints in the designer’s lap. While we are in the book, let’s go to TMS 602-13 (aka, the Specification). Paragraph 2.5.B provides the ASTM standard for product to be installed. Now that I have you in the Specification – please read with comprehension the “Forward to Specification Checklists.” Having digested that, now turn the page to the Mandatory Requirement Checklist Part 3 – Execution. There under “Notes to the Architect/Engineer”. Let’s read it together, “Indicate type and location of movement joints on the project drawings.” We can now agree that it is not the masonry contractor’s responsibility to design and locate expansion joints. However, make sure the design and construction teams understand that if they only provide guidance, such as giving you the maximum distance between the joints, but will not locate them on the drawing, YOU, the masonry contractor, are free to put them anywhere to your advantage. GET THIS IN WRITING ALSO! The Brick Industry Association has a couple of technical notes, 18 and 18A, on the subject of movement. You may want to provide them to your CM/GC to pass on to the design team. To make a long story short – Do Not Deviate - one bit from the project drawing and specifications without getting it in writing. If they now provide you the layout, it could be the RFI could change to a Potential Change Order (PCO). The expansion joints will increase labor costs and if they require you to install the sealant joint, it is a PCO. Thanks for the question and don’t forget to “Raise the line and come on around the corner!”
The STABILA Force Driven by Operations
July 2025

Leadership In today's competitive business landscape, maintaining an efficient, well-organized warehouse is essential for meeting customer demands and ensuring smooth operations. By implementing effective processes and best practices, businesses can achi

MASONRY STRONG Podcast, Episode 24 Recap: Gary Hensley, VP of Sales at Oldcastle Adams
July 2025

On this episode of the MASONRY STRONG Podcast, Gary Hensley joins Justin in Indianapolis to talk about his story within the masonry industry, how he got started, how he's seen it evolve, and where he sees it going. Why the Masonry Industry? Concrete and

The Enduring Power of Structural Masonry
July 2025

Masonry has been holding its ground for millennia — literally. And thanks to the simple brilliance of arching action, it continues to do so with strength, style, and surprising efficiency. In an era of advanced modeling and fast-moving schedules, one time

Business Building: Do Project Manager / Estimator Combos Work?
July 2025

Steve owns SJP Contractors, a mid-size general contractor specializing in commercial projects. Over the last several years, his company has grown to over $16 million in annual sales, with an average project size of $500,000 to $1,500,000, employing 45 off