Masonry Magazine September 2001 Page. 29
More Scaffold Less Money
Two speed winch. Strongest construction. Fastest to move. Legal to climb and access. Safest. Five plank back platform.
0-5 plank outside corner bracket makes corners easier and safer.
Strongest cable.
2 fixed center planks. Adjustable to 8 planks wide. 8" or 12" block or brick with plenty of room. Fully removable.
Adjustable 0 to 6 planks. Can start out on the ground. Fully removable.
0-5 plank inside corner bracket saves you over 1 pair of scaffold.
EZ Bridge
Set-Up by hand or move fully assembled.
Adjustable 10'-21'.
1 pair spreads up to 21'. 2 pair spreads up to 49'.
800/699/6831
FUTURE
Fastest Growing
EZ SCAFFOLD
CORPORATION